FAISALABAD: The Faisalabad Electric Supply Company (Fesco) has started work for installation of new
transformers to strengthen the power distribution system in the region. In this connection, a double capacity transformer had been installed at the 132 KV Khanuana Grid Station, the Fesco sources said.
Earlier, a power transformer of 10/13 MVA capacity was also installed on this grid station which was upgraded.
