NTDC BoDs approves grid code 2022

Islamabad

ISLAMABAD:The Board of Directors of National Transmission and Despatch Company (NTDC) approved draft Grid Code 2022 for onward submission to National Electric Power Regulatory Authority (NEPRA).

The Grid Code was prepared on international standards by NTDC team, which was an essential requirement of the regulation of electric network supply and delivery system, said a press release.

NTDC team had completed the revised Grid Code in the light of upcoming CTBCM market, new technologies, new voltage levels and increased penetration of Renewable Energy in Pakistan’s Power Sector including KE.

Chairman BoDs, Naveed Ismail, appreciated the strenuous efforts of the team which prepared the Draft Grid Code 2022.

Managing Director NTDC Dr. Engr. Rana Abdul Jabbar Khan also highlighted the synergy and commitment of the team how they took this challenging task in a difficult situation and managed to produce quality document based on international standards.

Leave a Reply

Your email address will not be published. Required fields are marked *